Well I thought I'd give you a quick update.
Our contract was accepted. We had our home inspection last week. Here is a list of the things that need to be fixed.
- Slate roof is missing some shingle and the roof needs some work
- Sidewalk outfront presents a tripping hazard, needs to be leveled
- Air conditioning unit has several rusted fins that need replacing
- Sewer pipe (cast iron) has a crack and needs to be replaced
- Boiler has a leaky valve that needs to be fixed
The rest is pretty much cosmetic, but we do want the major stuff done before we move in. We'll clean it up and make it pretty. :)
Probably is the ex-wife does not want to do ANYTHING, and is basically being a greedy little whore. So, now we've had to actually get lawyers involved. :(
So, as it stands our closing date is January 15th and then we move into our new humble abode. Hopefully things continue to work themeselves out. Cross your fingers for us. Home buying is stressfull. :(